... primary distribution network at which power losses during a week with maximum load and during a week with minimum load the power losses would be close to losses at optimum hourly reconfiguration. Data on the mix of loop branches obtained during the reconfiguration algorithm operation is used for selecting the tie-switches that allow both the regime restoration after emergency opening of a sectionalized switch, and acceleration of this process, especially if the tie-switch is remotely-controlled....
Теги: maximum load , minimizing the number of , minimum load , power-losses , primary distribution networks , reconfiguration algorithm , test systems , tie switch