Minimizing the number of remotely controlled switches when the planning the reconfiguration of a primary distribution network
The work shows the possibility to select the permanent configuration of a primary distribution network at which power losses during a week with maximum load and during a week with minimum load the power losses would be close to losses at optimum hourly reconfiguration. Data on the mix of loop branches obtained during the reconfiguration algorithm operation is used for selecting the tie-switches that allow both the regime restoration after emergency opening of a sectionalized switch, and acceleration of this process, especially if the tie-switch is remotely-controlled. The IEEE 33-node test systems are used to demonstrate the proposed algorithms. © 2018 The Authors, published by EDP Sciences.
Библиографическая ссылка
Golub I., Voitov O., Boloev E., Semenova L. Minimizing the number of remotely controlled switches when the planning the reconfiguration of a primary distribution network // E3S Web of Conferences. Vol.58. ID: 02016. 2018. DOI: 10.1051/e3sconf/20185802016