Promising Types of Principal Power Plant Equipment. [O PERSPEKTIVNYKH TIPAKH OSNOVNOGO OBORUDOVANIYA ELEKTROSTANTSII.]

Статья в журнале
Lavrenenko K.D., Melent'ev L.A., Popyrin L.S., Gapeev V.V.
Teploenergetika. No.9. P.2-5.
1977
Some criticism of the existing power plant construction policy in the USSR is followed by a statement of desirable policies. In particular, it is argued that in the European part of the USSR there should be no limit on the concentration of equipment, i. e. , units with unit capacity of 2-3 million kW should be built there. There should be restrictions on the fuel used. New basic condensing power plants fired by nuclear fuel and coal should be rapidly built. Long-term requirements in maneuverable semi-peak and peak equipment should not be underestimated and should be made more precise. The use of nuclear power plants for combined heat and power production and development of a type of fast neutron reactor within 10 years is urged. Research on the feasibility of underground pumped storage hydroelectric power plants is proposed.

Библиографическая ссылка

Lavrenenko K.D., Melent'ev L.A., Popyrin L.S., Gapeev V.V. Promising Types of Principal Power Plant Equipment. [O PERSPEKTIVNYKH TIPAKH OSNOVNOGO OBORUDOVANIYA ELEKTROSTANTSII.] // Teploenergetika. No.9. 1977. P.2-5.
SCOPUS